Drop-dead date (outside date): what it is, and how long deals give
Updated
A drop-dead date is the date after which either side can end a merger agreement if the deal hasn't closed. Agreements call it the end date, the termination date or the outside date.
Sellers often ask for one in the letter of intent, and the agreement sets it. In 46 public merger agreements signed 2023 to 2026, the median outside date was 7.1 months after signing, and 34 of them could be extended.
How long public deals give
Half of the agreements set the date between 5.8 and 9.0 months after signing. 44 of 46 set it within a year.
- Up to 34
- 3 to 618
- 6 to 917
- 9 to 125
- Over 122
| Measure | Value |
|---|---|
| Agreements with an outside date | 46 of 50 |
| Median, months from signing | 7.1 |
| Middle half of deals | 5.8 to 9.0 months |
| Shortest and longest | 1.9 and 18 months |
| 6 months or less | 22 of 46 |
| 12 months or less | 44 of 46 |
| Can be extended | 34 of 46 |
| Median longest date with extensions | 12 months |
What is another name for drop-dead date?
Most agreements use one of three names: 16 call it the End Date, 14 the Termination Date and 12 the Outside Date. 3 give it no defined name, and one in this set says Drop Dead Date.
| What the agreement calls it | Agreements | Example |
|---|---|---|
| “End Date” | 16 | Neuphoria Therapeutics: “Merger has not been consummated on or before February 28, 2027 (the ‘End Date’), unless extended by mutual written” |
| “Termination Date” | 14 | The Brand House Collective: “if the Merger shall not have been consummated on or before the date that is six (6) months after the date hereof (the ‘Termination Date’)” |
| “Outside Date” | 12 | Alkeus Pharmaceuticals: “if the Closing shall not have been consummated on or before 11:59 p.m. Eastern Time on October 31, 2026 (the ‘Initial Outside Date’)” |
| No defined name, just a date | 3 | Atrion: “by either Parent or the Company, if the Effective Time shall not have occurred by 5:00 p.m., New York time, on February 28, 2025” |
| “Drop Dead Date” | 1 | Omnetics Connector: “if the Closing shall not have occurred by December 31, 2026 (the ‘Drop Dead Date’)” |
When the date extends
In 22 of the 34 that can extend, the trigger is regulatory approval still pending when everything else is done. The median extension adds 3 months.
| Why the date extends | Agreements |
|---|---|
| Regulatory approval is still pending | 22 |
| Another named closing condition is still open | 5 |
| A lawsuit to enforce the agreement is pending | 4 |
| The SEC hasn't finished reviewing the deal documents | 3 |
What to negotiate
Set the first date with room for the slowest approval the deal needs. If clearance is the risk, the seller can ask for an extension tied to regulatory approval, as 22 of these agreements have. It can also ask for a fee if the buyer fails to get clearance, as 5 have.
What happens at the date
Either side can end the agreement once the date passes, unless its own breach caused the delay. In 5 of 50 agreements, the buyer then owed the target a fee because regulators hadn't cleared the deal.
Three deals signed and closed on the same day, so they needed no outside date.
| Target | Buyer | Signed |
|---|---|---|
| Trawsfynydd Therapeutics | Onconova Therapeutics | Apr 2024 |
| North Peak Oil & Gas and Century Oil and Gas | PEDEVCO | Nov 2025 |
| Omega Foundation Services | Solaris Energy Infrastructure | Sep 2026 |
Every outside date, deal by deal
Sorted from the shortest to the longest. Each target links to its agreement on the SEC's site.
| Target | Buyer | Signed | Months to outside date | Can extend to | Where |
|---|---|---|---|---|---|
| Sterno (Compass Diversified's food service business) | Archer Foodservice Partners | Mar 2026 | 1.9 | 3.9 months | 8.1(b) |
| Tomahawk Robotics | AeroVironment | Aug 2023 | 3 | No | 9.01(b)(ii) |
| Marucci Sports | Fox Factory | Nov 2023 | 3 | No | 8.06(b) |
| Alkeus Pharmaceuticals | Tarsus Pharmaceuticals | Sep 2026 | 3 | 6 months | 9.1(d) |
| Apexigen | Pyxis Oncology | May 2023 | 3.9 | No | Section 8.01(b)(i) |
| AdTheorent | Cadent | Jun 2024 | 3.9 | 5.7 months | Section 1.01 End Date |
| Gelesis | PureTech Health | Jun 2023 | 4 | No | Section 8.2(a) |
| Revelyst (Vista Outdoor's outdoor products business) | Strategic Value Partners | Oct 2024 | 4 | 5 months | 8.01(b)(i) |
| Iodine Software | Waystar | Jul 2025 | 4 | No | 9.1(b)(i) |
| Urgent.ly | Agero | Mar 2026 | 4.6 | No | 9.1(c) |
| Verde Bioresins | Nxu | Oct 2024 | 5.3 | No | 10.01(b)(ii) and 10.01(c)(ii) |
| Hall of Fame Resort & Entertainment | an Industrial Realty Group affiliate | May 2025 | 5.8 | No | 8.1(c) |
| EnLink Midstream | ONEOK | Nov 2024 | 5.9 | No | 8.1(b)(i) |
| Sumo Logic | Francisco Partners | Feb 2023 | 6 | 9 months | Section 8.1(c) |
| SciPlay | Light & Wonder | Aug 2023 | 6 | No | Section 8.1(b)(i) |
| Rover Group | Blackstone funds | Nov 2023 | 6 | No | 8.1(c) |
| U.S. Silica | Apollo funds | Apr 2024 | 6 | 9 months | Section 7.1(b) |
| Triumph Group | Warburg Pincus and Berkshire Partners | Feb 2025 | 6 | 9 months | Section 8.01(b)(i) |
| Inozyme Pharma | BioMarin | May 2025 | 6 | 9 months | Section 9.1(b)(i) |
| Motiv Power Systems | Workhorse Group | Aug 2025 | 6 | 8 months | 9.1(b) |
| The Brand House Collective | Bed Bath & Beyond | Nov 2025 | 6 | No | Section 7.1(b)(i) |
| Amicus Therapeutics | BioMarin | Dec 2025 | 6 | 12 months | 7.1(b) |
| Smartsheet | Blackstone and Vista Equity Partners | Sep 2024 | 7 | 12 months | 7.1(b)(i) |
| Aura Smart Air | Molekule | Feb 2023 | 7.1 | No | Section 8.01(b)(i) |
| Omnetics Connector | Arxis | Jun 2026 | 7.1 | No | 8.01(b) |
| Neuphoria Therapeutics | Scancell | Jul 2026 | 7.2 | 9.2 months | 9.01(b)(i) |
| Akoya Biosciences | Quanterix | Apr 2025 | 7.7 | No | 8.01(d)(ii) |
| Earthstone Energy | Permian Resources | Aug 2023 | 8 | 12 months | Annex A definition of Outside Date |
| Instructure | KKR | Jul 2024 | 8 | No | Section 8.1(c) |
| Notable Labs | Vascular Biogenics | Feb 2023 | 9 | 11 months | 10.1(b) |
| Eagle Bulk Shipping | Star Bulk Carriers | Dec 2023 | 9 | 12 months | Section 8.01(b)(i) |
| NuStar Energy | Sunoco | Jan 2024 | 9 | 15 months | Section 7.1(b) |
| Hibbett | JD Sports | Apr 2024 | 9 | 15 months | 7.1(c) |
| Atrion | Nordson | May 2024 | 9 | 15 months | Section 8.01(b) |
| Altus Power | TPG Rise Climate | Feb 2025 | 9 | No | Section 9.01(b) |
| Semrush | Adobe | Nov 2025 | 9 | 12 months | Section 8.1(d) |
| OneStream | Onward AcquireCo | Jan 2026 | 9 | 15 months | 8.1(c) |
| Arcellx | Gilead Sciences | Feb 2026 | 9 | 12 months | 8.01(b) |
| MarineMax | Safe Harbor Marinas | Aug 2026 | 9 | 15 months | 7.01(b)(i) |
| Pioneer Natural Resources | Exxon Mobil | Oct 2023 | 12 | 18 months | Section 10.01(b)(i) |
| Six Flags | Cedar Fair (merger of equals) | Nov 2023 | 12 | 24 months | Section 10.1(b)(i) |
| Bally's | Standard General | Jul 2024 | 12 | No | 10.1(c) |
| Chart Industries | Baker Hughes | Jul 2025 | 12 | 24 months | Section 9.01(b)(i) |
| Range Resources | EQT | Oct 2026 | 12 | 18 months | 7.1(b) |
| Jacobs' Critical Mission Solutions and Cyber & Intelligence units | Amentum | Nov 2023 | 13 | 19 months | Section 9.1(b) |
| Dominion Energy | NextEra Energy | May 2026 | 18 | 27 months | 7.01(b)(i) |
Common questions
What is a drop-dead date?
It's the last date for closing a deal. After it passes, either side can end the agreement without breaching it.
Is it dead drop or drop dead?
In deal documents it's drop-dead, as in a drop-dead date. A dead drop is a hiding place for passing secret messages.
Send the seller a request list built for your deal
254 requests across 20 workstreams, each with the red flag it catches. Free, and no email asked.
Build the request listThe deal counts on this page come from 50 merger agreements filed with the SEC from January 2023 to October 2026, ten from each of five sectors. 37 of the targets were public companies and 13 private. Each figure links to the filing it came from. Updated 9 Nov 2026. This is general information, not legal advice.